Detailed Project Description:
10/17/2022 8:23:41 PM
Three stories plus a partial basement
4/19/2023 12:32:57 PM
Plans must be legible for inspections to be performed. (SEE FINAL REVIEWER ON COMMENTS)
Permit, inspection card/sheet, and stamped approved plans must be kept at the job site for the inspector to perform inspections.
To schedule inspections, please sign in to your account and look for your permit on my dashboard and click on it to request an inspection. Inspections scheduled Monday through Friday before 11:59 pm will be on the schedule for the next available day.
PE ENGINEER LETTERS ARE REQUIRED FOR THE FOUNDATION SYSTEM - REQUIRED BY THE FIRST FRAME. (UPLOAD COPY TO THE PERMIT THROUGH ETRAKIT AND GIVE ORIGINAL TO INSPECTOR)
SPECIAL INSPECTIONS ARE REQUIRED TO BE UPLOADED TO THE PERMIT RECORD THROUGH THE eTRAKiT PORTAL AND GIVE THE ORIGINAL TO INSPECTOR.
ALL ROUGHS ARE REQUIRED TO BE APPROVED BEFORE SCHEDULING THE ROUGH FRAME
ROUGH FIRE AND FINAL FIRE INSPECTIONS ARE PERFORMED BY SOUTH METRO FIRE RESCUE - CONTACT THEM TO SET UP - UPLOAD SMFR INSPECTIONS REPORT TO THE PERMIT THROUGH THE eTRAKiT PORTAL.
TCO/CO inspections take 5 to 6 business days to complete. (not counting the day we receive the request) Email: buildingpermits@littletongov.org reference permit number and job address. An ‘inspection completeness check’ is conducted before ANY TCO/CO process is initiated. Final Engineering and Final Planning inspections are part of the TCO/CO process.