Additional Details::
10/19/2021 12:42:48 PM
None
11/2/2021 1:53:34 PM
Please note: CO/TCO Inspections takes 6 business days to complete (each). To initiate: send an email to: permits@littletongov.org - referencing the permit number and address. and request for a TCO or CO. (CO inspections after TCO takes 6 business days to complete)
12/2/2021 11:23:15 AM
Conditions:
Separate ROW permits are required for any work or staging in the public ROW/alleyway.
PROPOSED SEWER CONNECTION SHALL REUSE THE EXISTING TAP AT THE MAIN.
Erosion and Sediment Control BMPs must be installed and maintained according to the approved plan for the duration of the project, including post construction final stabilization.
Prior to requesting a CO and/or closing out this permit, the adjacent curb, gutter, and sidewalks in the public ROW shall be cleaned by The Permittee for inspection by The City and any damaged areas shall be replaced by the Permittee as directed by The Littleton Engineering Division.
Disturbed areas shall be restored and reach final stabilization (70% of pre-disturbance uniform vegetative cover, or other permanent cover) prior to removal of BMPs or requesting CO and/or closing out this permit.