Detailed Project Description:
3/8/2024 4:07:12 PM
Winery Storage (S-2) under 16% alcohol, sprinkler system provided, new address 6881 S Santa Fe Drive
5/20/2024 4:56:02 PM
A CERTIFICATE OF OCCUPANCY MUST BE OBTAINED BEFORE THE STRUCTURE IS OCCUPIED
Schedule inspections through the eTRAKiT portal. Every attempt will be made to honor AM/PM requests but arrival during those time frames is not guaranteed. Check for inspection times on the day of your inspection after 8 am to see a 'tentative' time of AM or PM through the eTRAKiT portal. (you do not need to sign into your account – click on ‘Scheduled’ under the Inspections tab and click on the permit number) Please note: the inspector has a four-hour window.
******PLEASE NOTE: ALL ROUGHS MUST BE APPROVED BEFORE SCHEDULING THE ROUGH FRAME
PE ENGINEER LETTERS ARE REQUIRED FOR THE FOUNDATION SYSTEM - REQUIRED BY THE FIRST FRAME. (UPLOAD COPY TO THE PERMIT THROUGH eTRAKiT. SCHEDULE THE PE ENGINEER INSPECTION AND GIVE ORIGINAL LETTER TO INSPECTOR)
SPECIAL INSPECTIONS ARE REQUIRED TO BE UPLOADED TO THE PERMIT RECORD THROUGH THE eTRAKiT PORTAL AND GIVE THE ORIGINAL TO INSPECTOR.
CONTACT SOUTH METRO FIRE RESCUE FOR ROUGH FIRE AND FINAL FIRE INSPECTIONS - load inspection results to permit record through the eTRAKiT portal.
The Permit, Permit Reviews, Permit Inspection card/sheet, and the City stamped approved plans are required to be kept at the job site for the inspector to perform inspections. Print the pages on the correct size of paper without shrinking the stamped approved plans. Plans must be legible for inspections to be performed.